ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive dealers and gasoline service stations
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $214k 41k
MMBtu
$10.92
- Electrical $178k 1,585k
kWh
$0.12
- Natural Gas $22k 25k
MMBtu
$4.70

31

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.1k
MMBtu
5.0%
- Electrical $25k 202k
kWh
12.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $37k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $252k 50k
MMBtu
$11.08
- Electrical $215k 1,833k
kWh
$0.13
- Natural Gas $28k 31k
MMBtu
$2.24

11

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $5.5k 0.4k
MMBtu
0.9%
- Electrical $5.2k 43k
kWh
2.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $47k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall