ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive dealers and gasoline service stations
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $252k 50k
MMBtu
$11.08
- Electrical $215k 1,833k
kWh
$0.13
- Natural Gas $28k 31k
MMBtu
$2.24

27

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.4k
MMBtu
4.8%
- Electrical $30k 233k
kWh
12.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $47k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $259k 22k
MMBtu
$14.21
- Electrical $254k 2,119k
kWh
$0.14
- Natural Gas $1.3k 0.2k
MMBtu
$2.70

7

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.9k 0.4k
MMBtu
1.7%
- Electrical $4.9k 37k
kWh
1.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $4.9k
*May be negative reflecting an increased cost component required to save energy and costs overall