ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive dealers and gasoline service stations
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $214k 41k
MMBtu
$10.92
- Electrical $178k 1,585k
kWh
$0.12
- Natural Gas $22k 25k
MMBtu
$4.70

31

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.1k
MMBtu
5.0%
- Electrical $25k 202k
kWh
12.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $37k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $214k 41k
MMBtu
$10.92
- Electrical $178k 1,585k
kWh
$0.12
- Natural Gas $22k 25k
MMBtu
$4.70

13

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.8k 0.4k
MMBtu
1.0%
- Electrical $4.4k 40k
kWh
2.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $37k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall