The ITAC Statistics page displays the average assessment results for the selected criteria.
5
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $480k | 52k |
MMBtu
|
$9.74 |
- Electrical | $195k | 2,938k |
kWh
|
$0.078 |
- Natural Gas | $220k | 22k |
MMBtu
|
$5.89 |
28
Recommendations
5.6
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $31k | 2.2k |
MMBtu
|
4.4% |
- Electrical | $15k | 219k |
kWh
|
7.5% |
- Natural Gas | $15k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $14k | |||
TOTAL | $45k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
5
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $480k | 52k |
MMBtu
|
$9.74 |
- Electrical | $195k | 2,938k |
kWh
|
$0.078 |
- Natural Gas | $220k | 22k |
MMBtu
|
$5.89 |
10
Implemented Recommendations
2.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $3.6k | 0.4k |
MMBtu
|
0.7% |
- Electrical | $3.3k | 37k |
kWh
|
1.3% |
- Natural Gas | $0.2k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $3.6k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |