ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC General merchandise stores
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $87k 17k
MMBtu
$5.50
- Electrical $56k 1,464k
kWh
$0.049
- Natural Gas $11k 1.9k
MMBtu
$8.82

17

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.1k
MMBtu
12.2%
- Electrical $8.0k 201k
kWh
13.7%
- Natural Gas $9.2k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $104k 21k
MMBtu
$5.34
- Electrical $70k 1,995k
kWh
$0.039
- Natural Gas $2.3k 0.2k
MMBtu
$10.65

4

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.1k 1.3k
MMBtu
6.5%
- Electrical $6.4k 131k
kWh
6.6%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $7.1k
*May be negative reflecting an increased cost component required to save energy and costs overall