ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Beer and ale
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,927k 376k
MMBtu
$13.90
- Electrical $1,100k 15,096k
kWh
$0.12
- Natural Gas $597k 222k
MMBtu
$7.51

25

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $173k 15k
MMBtu
3.9%
- Electrical $94k 1,431k
kWh
9.5%
- Natural Gas $21k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $173k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,432k 495k
MMBtu
$11.60
- Electrical $1,358k 19,493k
kWh
$0.11
- Natural Gas $795k 296k
MMBtu
$4.80

9

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 3.3k
MMBtu
0.7%
- Electrical $26k 320k
kWh
1.6%
- Natural Gas $2.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $63k