ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products, not elsewhere classified
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $985k 150k
MMBtu
$6.72
- Electrical $495k 8,204k
kWh
$0.055
- Natural Gas $420k 66k
MMBtu
$6.19

40

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $205k 12k
MMBtu
8.0%
- Electrical $72k 1,176k
kWh
14.3%
- Natural Gas $127k -
MMBtu
-
Waste $1.8k
Productivity/Other $18k
TOTAL $225k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,776k 273k
MMBtu
$6.51
- Electrical $897k 14,729k
kWh
$0.056
- Natural Gas $777k 122k
MMBtu
$6.28

13

Implemented Recommendations

6.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $241k 8.3k
MMBtu
3.0%
- Electrical $52k 805k
kWh
5.5%
- Natural Gas $185k -
MMBtu
-
Waste -
Productivity/Other ($-4.6)k
TOTAL $236k
*May be negative reflecting an increased cost component required to save energy and costs overall