ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Grain and field beans
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $344k 34k
MMBtu
$10.84
- Electrical $160k 2,742k
kWh
$0.059
- Natural Gas $36k 5.5k
MMBtu
$4.77

12

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.3k
MMBtu
9.8%
- Electrical $15k 322k
kWh
11.8%
- Natural Gas $1.1k -
MMBtu
-
Waste -
Productivity/Other $12k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $344k 34k
MMBtu
$10.84
- Electrical $160k 2,742k
kWh
$0.059
- Natural Gas $36k 5.5k
MMBtu
$4.77

7

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 0.2k
MMBtu
0.6%
- Electrical $1.5k 20k
kWh
0.7%
- Natural Gas $1.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall