ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Meats and meat products
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $494k 87k
MMBtu
$7.31
- Electrical $364k 6,604k
kWh
$0.060
- Natural Gas $30k 19k
MMBtu
$4.31

17

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 8.7k
MMBtu
10.0%
- Electrical $65k 846k
kWh
12.8%
- Natural Gas $1.2k -
MMBtu
-
Waste $4.5k
Productivity/Other $0.3k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $458k 93k
MMBtu
$7.24
- Electrical $318k 6,294k
kWh
$0.059
- Natural Gas $41k 28k
MMBtu
$4.15

4

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.9k 0.5k
MMBtu
0.5%
- Electrical $1.4k 46k
kWh
0.7%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.9k
*May be negative reflecting an increased cost component required to save energy and costs overall