ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Packaged frozen foods
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $995k 424k
MMBtu
$6.07
- Electrical $400k 11,439k
kWh
$3.63
- Natural Gas $345k 307k
MMBtu
$7.26

48

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $117k 16k
MMBtu
3.9%
- Electrical $61k 1,605k
kWh
14.0%
- Natural Gas $20k -
MMBtu
-
Waste $2.6k
Productivity/Other $153k
TOTAL $273k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,082k 498k
MMBtu
$5.34
- Electrical $427k 12,707k
kWh
$4.35
- Natural Gas $402k 368k
MMBtu
$6.55

14

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 7.5k
MMBtu
1.5%
- Electrical $25k 734k
kWh
5.8%
- Natural Gas $10k -
MMBtu
-
Waste $3.2k
Productivity/Other -
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall