ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Groceries and related products
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $695k 260k
MMBtu
$6.23
- Electrical $363k 8,463k
kWh
$1.85
- Natural Gas $191k 173k
MMBtu
$5.02

90

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $77k 9.6k
MMBtu
3.7%
- Electrical $44k 933k
kWh
11.0%
- Natural Gas $11k -
MMBtu
-
Waste $1.3k
Productivity/Other $77k
TOTAL $155k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $737k 281k
MMBtu
$5.91
- Electrical $377k 9,023k
kWh
$2.01
- Natural Gas $207k 189k
MMBtu
$4.81

26

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 4.1k
MMBtu
1.5%
- Electrical $15k 398k
kWh
4.4%
- Natural Gas $4.9k -
MMBtu
-
Waste $1.4k
Productivity/Other $0.0k
TOTAL $26k
*May be negative reflecting an increased cost component required to save energy and costs overall