The ITAC Statistics page displays the average assessment results for the selected criteria.
16
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $603k | 207k |
MMBtu
|
$6.49 |
- Electrical | $321k | 7,367k |
kWh
|
$1.40 |
- Natural Gas | $150k | 131k |
MMBtu
|
$7.41 |
115
Recommendations
7.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $76k | 10k |
MMBtu
|
4.9% |
- Electrical | $49k | 984k |
kWh
|
13.4% |
- Natural Gas | $8.0k | - |
MMBtu
|
- |
Waste | $1.0k | |||
Productivity/Other | $58k | |||
TOTAL | $135k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
14
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $632k | 230k |
MMBtu
|
$6.02 |
- Electrical | $333k | 7,891k |
kWh
|
$1.59 |
- Natural Gas | $167k | 149k |
MMBtu
|
$7.18 |
34
Implemented Recommendations
2.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $20k | 3.3k |
MMBtu
|
1.4% |
- Electrical | $13k | 320k |
kWh
|
4.1% |
- Natural Gas | $3.9k | - |
MMBtu
|
- |
Waste | $1.1k | |||
Productivity/Other | $0.0k | |||
TOTAL | $21k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |