ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Groceries and related products
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $603k 207k
MMBtu
$6.49
- Electrical $321k 7,367k
kWh
$1.40
- Natural Gas $150k 131k
MMBtu
$7.41

115

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 10k
MMBtu
4.9%
- Electrical $49k 984k
kWh
13.4%
- Natural Gas $8.0k -
MMBtu
-
Waste $1.0k
Productivity/Other $58k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $632k 230k
MMBtu
$6.02
- Electrical $333k 7,891k
kWh
$1.59
- Natural Gas $167k 149k
MMBtu
$7.18

34

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 3.3k
MMBtu
1.4%
- Electrical $13k 320k
kWh
4.1%
- Natural Gas $3.9k -
MMBtu
-
Waste $1.1k
Productivity/Other $0.0k
TOTAL $21k
*May be negative reflecting an increased cost component required to save energy and costs overall