ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wholesale trade-non-durable goods
3+ Characters Required for Products

40

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $782k 164k
MMBtu
$8.81
- Electrical $460k 7,628k
kWh
$0.61
- Natural Gas $187k 86k
MMBtu
$6.24

285

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $129k 13k
MMBtu
7.7%
- Electrical $80k 1,226k
kWh
16.1%
- Natural Gas $27k -
MMBtu
-
Waste $1.1k
Productivity/Other $28k
TOTAL $158k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $828k 188k
MMBtu
$7.81
- Electrical $482k 8,309k
kWh
$0.72
- Natural Gas $224k 103k
MMBtu
$6.66

103

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 3.3k
MMBtu
1.8%
- Electrical $19k 327k
kWh
3.9%
- Natural Gas $23k -
MMBtu
-
Waste $0.5k
Productivity/Other $2.9k
TOTAL $51k