The ITAC Statistics page displays the average assessment results for the selected criteria.
6
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $750k | 107k |
MMBtu
|
$10.47 |
- Electrical | $359k | 9,927k |
kWh
|
$0.052 |
- Natural Gas | $30k | 4.8k |
MMBtu
|
$9.58 |
36
Recommendations
6.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $79k | 7.1k |
MMBtu
|
6.7% |
- Electrical | $39k | 692k |
kWh
|
7.0% |
- Natural Gas | $7.7k | - |
MMBtu
|
- |
Waste | $3.2k | |||
Productivity/Other | - | |||
TOTAL | $82k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $979k | 143k |
MMBtu
|
$9.13 |
- Electrical | $472k | 13,326k |
kWh
|
$0.055 |
- Natural Gas | $34k | 6.7k |
MMBtu
|
$4.29 |
7
Implemented Recommendations
1.8
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $14k | 0.4k |
MMBtu
|
0.3% |
- Electrical | $3.5k | 42k |
kWh
|
0.3% |
- Natural Gas | $2.8k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | - | |||
TOTAL | $14k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |