ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Machinery, equipment, and supplies
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,068k 360k
MMBtu
$15.34
- Electrical $545k 7,427k
kWh
$0.075
- Natural Gas $364k 284k
MMBtu
$8.12

48

Recommendations

9.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 12k
MMBtu
3.3%
- Electrical $26k 1,150k
kWh
15.5%
- Natural Gas $12k -
MMBtu
-
Waste $9.1k
Productivity/Other $18k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,319k 450k
MMBtu
$6.57
- Electrical $678k 9,258k
kWh
$0.063
- Natural Gas $454k 355k
MMBtu
$5.72

24

Implemented Recommendations

6.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 12k
MMBtu
2.7%
- Electrical $19k 1,168k
kWh
12.6%
- Natural Gas $5.0k -
MMBtu
-
Waste $7.2k
Productivity/Other $4.1k
TOTAL $59k