ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Refrigeration equipment and supplies
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $981k 61k
MMBtu
$16.19
- Electrical $827k 5,908k
kWh
$0.14
- Natural Gas -
-
MMBtu
-

8

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 6.9k
MMBtu
11.4%
- Electrical $88k 676k
kWh
11.4%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $6.9k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $981k 61k
MMBtu
$16.19
- Electrical $827k 5,908k
kWh
$0.14
- Natural Gas -
-
MMBtu
-

5

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 4.5k
MMBtu
7.5%
- Electrical $62k 443k
kWh
7.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $6.9k
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall