ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Warm air heating and air-conditioning equipment and supplies
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $626k 76k
MMBtu
$8.25
- Electrical $305k 4,899k
kWh
$0.062
- Natural Gas $184k 26k
MMBtu
$7.20

9

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $153k 7.2k
MMBtu
9.5%
- Electrical $68k 702k
kWh
14.3%
- Natural Gas $84k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $153k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $626k 76k
MMBtu
$8.25
- Electrical $305k 4,899k
kWh
$0.062
- Natural Gas $184k 26k
MMBtu
$7.20

5

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $72k 5.8k
MMBtu
7.6%
- Electrical $55k 565k
kWh
11.5%
- Natural Gas $17k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall