ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic parts and equipment, not elsewhere classified
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $227k 32k
MMBtu
$7.03
- Electrical $191k 3,149k
kWh
$0.061
- Natural Gas -
-
MMBtu
-

7

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $164k 22k
MMBtu
66.9%
- Electrical $164k 2,106k
kWh
66.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $89k
TOTAL $253k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $227k 32k
MMBtu
$7.03
- Electrical $191k 3,149k
kWh
$0.061
- Natural Gas -
-
MMBtu
-

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 1.6k
MMBtu
5.1%
- Electrical $29k 160k
kWh
5.1%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $29k