The ITAC Statistics page displays the average assessment results for the selected criteria.
4
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $347k | 34k |
MMBtu
|
$11.56 |
- Electrical | $239k | 2,723k |
kWh
|
$0.100 |
- Natural Gas | $64k | 6.4k |
MMBtu
|
$10.46 |
30
Recommendations
7.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $24k | 2.2k |
MMBtu
|
6.5% |
- Electrical | $18k | 217k |
kWh
|
8.0% |
- Natural Gas | $5.9k | - |
MMBtu
|
- |
Waste | $0.5k | |||
Productivity/Other | $48k | |||
TOTAL | $73k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $347k | 34k |
MMBtu
|
$11.56 |
- Electrical | $239k | 2,723k |
kWh
|
$0.100 |
- Natural Gas | $64k | 6.4k |
MMBtu
|
$10.46 |
9
Implemented Recommendations
2.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $7.6k | 0.4k |
MMBtu
|
1.3% |
- Electrical | $2.9k | 42k |
kWh
|
1.6% |
- Natural Gas | $4.0k | - |
MMBtu
|
- |
Waste | $0.0k | |||
Productivity/Other | $0.3k | |||
TOTAL | $7.9k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |