ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction materials, not elsewhere classified
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $628k 37k
MMBtu
$23.97
- Electrical $463k 1,657k
kWh
$0.54
- Natural Gas $103k 20k
MMBtu
$3.73

20

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $101k 4.8k
MMBtu
13.0%
- Electrical $67k 469k
kWh
28.3%
- Natural Gas $28k -
MMBtu
-
Waste -
Productivity/Other $1.5k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $628k 37k
MMBtu
$23.97
- Electrical $463k 1,657k
kWh
$0.54
- Natural Gas $103k 20k
MMBtu
$3.73

8

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.3k
MMBtu
3.6%
- Electrical $12k 130k
kWh
7.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $1.5k
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall