ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lumber and other construction materials
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $523k 62k
MMBtu
$13.91
- Electrical $304k 4,149k
kWh
$0.22
- Natural Gas $60k 17k
MMBtu
$4.26

44

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 7.6k
MMBtu
12.2%
- Electrical $46k 738k
kWh
17.8%
- Natural Gas $14k -
MMBtu
-
Waste -
Productivity/Other $1.6k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $522k 69k
MMBtu
$12.39
- Electrical $353k 4,827k
kWh
$0.25
- Natural Gas $70k 20k
MMBtu
$2.69

19

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 4.5k
MMBtu
6.4%
- Electrical $20k 435k
kWh
9.0%
- Natural Gas $1.2k -
MMBtu
-
Waste -
Productivity/Other $2.0k
TOTAL $35k