ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicle supplies and new parts
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $469k 36k
MMBtu
$12.94
- Electrical $147k 3,210k
kWh
$0.046
- Natural Gas $32k 3.3k
MMBtu
$9.58

6

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.8k
MMBtu
4.9%
- Electrical $9.2k 172k
kWh
5.4%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $469k 36k
MMBtu
$12.94
- Electrical $147k 3,210k
kWh
$0.046
- Natural Gas $32k 3.3k
MMBtu
$9.58

2

Implemented Recommendations

2.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 1.1k
MMBtu
3.0%
- Electrical $5.8k 105k
kWh
3.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $10k
*May be negative reflecting an increased cost component required to save energy and costs overall