ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicles and motor vehicle parts and supplies
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $280k 24k
MMBtu
$10.09
- Electrical $105k 2,001k
kWh
$0.062
- Natural Gas $31k 4.0k
MMBtu
$7.99

15

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.8k
MMBtu
11.6%
- Electrical $19k 277k
kWh
13.8%
- Natural Gas $4.5k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $280k 24k
MMBtu
$10.09
- Electrical $105k 2,001k
kWh
$0.062
- Natural Gas $31k 4.0k
MMBtu
$7.99

5

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 0.7k
MMBtu
3.0%
- Electrical $4.4k 71k
kWh
3.5%
- Natural Gas $3.8k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $10k
*May be negative reflecting an increased cost component required to save energy and costs overall