ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steam and air-conditioning supply
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,963k 506k
MMBtu
$4.47
- Electrical $1,043k 19,187k
kWh
$0.052
- Natural Gas $1,265k 310k
MMBtu
$4.51

20

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 6.1k
MMBtu
1.2%
- Electrical $35k 597k
kWh
3.1%
- Natural Gas $33k -
MMBtu
-
Waste $0.7k
Productivity/Other $1.0k
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,963k 506k
MMBtu
$4.47
- Electrical $1,043k 19,187k
kWh
$0.052
- Natural Gas $1,265k 310k
MMBtu
$4.51

9

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 0.8k
MMBtu
0.2%
- Electrical $3.8k 80k
kWh
0.4%
- Natural Gas $8.8k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall