ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Refuse systems
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,499k 235k
MMBtu
$8.09
- Electrical $613k 8,762k
kWh
$0.059
- Natural Gas $705k 145k
MMBtu
$4.89

91

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $102k 14k
MMBtu
5.9%
- Electrical $85k 1,342k
kWh
15.3%
- Natural Gas ($-2.9)k -
MMBtu
-
Waste $3.1k
Productivity/Other $69k
TOTAL $175k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,533k 245k
MMBtu
$7.81
- Electrical $635k 8,837k
kWh
$0.060
- Natural Gas $750k 154k
MMBtu
$4.41

41

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 6.5k
MMBtu
2.7%
- Electrical $50k 636k
kWh
7.2%
- Natural Gas $1.6k -
MMBtu
-
Waste $0.1k
Productivity/Other $59k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall