ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sewerage systems
3+ Characters Required for Products

303

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $847k 111k
MMBtu
$9.17
- Electrical $554k 8,888k
kWh
$0.073
- Natural Gas $70k 15k
MMBtu
$3.88

1,757

Recommendations

5.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $208k 20k
MMBtu
18.3%
- Electrical $134k 1,977k
kWh
22.2%
- Natural Gas $14k -
MMBtu
-
Waste $11k
Productivity/Other $67k
TOTAL $287k
*May be negative reflecting an increased cost component required to save energy and costs overall

286

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $875k 115k
MMBtu
$9.03
- Electrical $572k 9,228k
kWh
$0.072
- Natural Gas $72k 15k
MMBtu
$3.71

879

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 11k
MMBtu
10.0%
- Electrical $74k 1,122k
kWh
12.2%
- Natural Gas $6.1k -
MMBtu
-
Waste $3.5k
Productivity/Other $15k
TOTAL $126k