ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sanitary services
3+ Characters Required for Products

250

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $906k 119k
MMBtu
$8.81
- Electrical $579k 9,360k
kWh
$0.069
- Natural Gas $103k 22k
MMBtu
$3.50

1,469

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $212k 22k
MMBtu
18.3%
- Electrical $137k 2,133k
kWh
22.8%
- Natural Gas $10k -
MMBtu
-
Waste $10k
Productivity/Other $60k
TOTAL $282k
*May be negative reflecting an increased cost component required to save energy and costs overall

247

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $913k 120k
MMBtu
$8.82
- Electrical $583k 9,425k
kWh
$0.069
- Natural Gas $104k 22k
MMBtu
$3.51

780

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 12k
MMBtu
10.0%
- Electrical $77k 1,178k
kWh
12.5%
- Natural Gas $0.8k -
MMBtu
-
Waste $4.0k
Productivity/Other $19k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall