ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sanitary services
3+ Characters Required for Products

308

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $897k 120k
MMBtu
$9.10
- Electrical $568k 9,082k
kWh
$0.072
- Natural Gas $104k 22k
MMBtu
$3.72

1,790

Recommendations

5.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $206k 20k
MMBtu
16.9%
- Electrical $134k 1,979k
kWh
21.8%
- Natural Gas $12k -
MMBtu
-
Waste $10k
Productivity/Other $64k
TOTAL $280k
*May be negative reflecting an increased cost component required to save energy and costs overall

286

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $919k 121k
MMBtu
$8.86
- Electrical $587k 9,469k
kWh
$0.070
- Natural Gas $105k 22k
MMBtu
$3.63

885

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 11k
MMBtu
9.5%
- Electrical $74k 1,116k
kWh
11.8%
- Natural Gas $4.8k -
MMBtu
-
Waste $3.5k
Productivity/Other $17k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall