ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sanitary services
3+ Characters Required for Products

312

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $888k 119k
MMBtu
$9.09
- Electrical $563k 8,995k
kWh
$0.072
- Natural Gas $102k 22k
MMBtu
$3.76

1,809

Recommendations

5.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $203k 20k
MMBtu
16.9%
- Electrical $132k 1,958k
kWh
21.8%
- Natural Gas $12k -
MMBtu
-
Waste $10k
Productivity/Other $63k
TOTAL $277k
*May be negative reflecting an increased cost component required to save energy and costs overall

289

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $931k 126k
MMBtu
$8.82
- Electrical $589k 9,486k
kWh
$0.070
- Natural Gas $109k 23k
MMBtu
$3.64

893

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 11k
MMBtu
9.1%
- Electrical $74k 1,119k
kWh
11.8%
- Natural Gas $4.8k -
MMBtu
-
Waste $3.4k
Productivity/Other $17k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall