Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sanitary services
3+ Characters Required for Products

298

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $912k 123k
MMBtu
$8.99
- Electrical $577k 9,261k
kWh
$0.071
- Natural Gas $106k 23k
MMBtu
$3.70

1,745

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $212k 21k
MMBtu
16.8%
- Electrical $135k 2,011k
kWh
21.7%
- Natural Gas $11k -
MMBtu
-
Waste $11k
Productivity/Other $66k
TOTAL $288k
*May be negative reflecting an increased cost component required to save energy and costs overall

267

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $922k 122k
MMBtu
$8.85
- Electrical $591k 9,617k
kWh
$0.070
- Natural Gas $107k 23k
MMBtu
$3.57

834

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 12k
MMBtu
9.5%
- Electrical $75k 1,135k
kWh
11.8%
- Natural Gas $2.5k -
MMBtu
-
Waste $3.7k
Productivity/Other $18k
TOTAL $128k
*May be negative reflecting an increased cost component required to save energy and costs overall