ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 4941 Water supply

109

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $576k 77k
MMBtu
$9.92
- Electrical $420k 6,752k
kWh
$0.077
- Natural Gas $37k 7.1k
MMBtu
$3.46

564

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 9.4k
MMBtu
12.3%
- Electrical $59k 918k
kWh
13.6%
- Natural Gas $3.7k -
MMBtu
-
Waste $17k
Productivity/Other $20k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

97

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $597k 81k
MMBtu
$9.37
- Electrical $436k 7,190k
kWh
$0.072
- Natural Gas $34k 6.6k
MMBtu
$3.17

231

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 4.2k
MMBtu
5.2%
- Electrical $27k 406k
kWh
5.6%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.3k
Productivity/Other $3.0k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall