ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Water supply
3+ Characters Required for Products

112

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $563k 75k
MMBtu
$9.90
- Electrical $410k 6,601k
kWh
$0.077
- Natural Gas $36k 6.9k
MMBtu
$3.49

576

Recommendations

5.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 9.3k
MMBtu
12.4%
- Electrical $60k 908k
kWh
13.8%
- Natural Gas $3.6k -
MMBtu
-
Waste $16k
Productivity/Other $20k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

99

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $609k 82k
MMBtu
$9.36
- Electrical $440k 7,209k
kWh
$0.072
- Natural Gas $40k 7.7k
MMBtu
$3.16

238

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 4.6k
MMBtu
5.6%
- Electrical $30k 447k
kWh
6.2%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.3k
Productivity/Other $3.0k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall