ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Water supply
3+ Characters Required for Products

109

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $576k 77k
MMBtu
$9.92
- Electrical $420k 6,752k
kWh
$0.077
- Natural Gas $37k 7.1k
MMBtu
$3.46

564

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 9.4k
MMBtu
12.3%
- Electrical $59k 918k
kWh
13.6%
- Natural Gas $3.7k -
MMBtu
-
Waste $17k
Productivity/Other $20k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

97

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $597k 81k
MMBtu
$9.37
- Electrical $436k 7,190k
kWh
$0.072
- Natural Gas $34k 6.6k
MMBtu
$3.17

231

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 4.2k
MMBtu
5.2%
- Electrical $27k 406k
kWh
5.6%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.3k
Productivity/Other $3.0k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall