ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric services
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $38,517k 12,415k
MMBtu
$4.25
- Electrical $3,908k 60,271k
kWh
$0.065
- Natural Gas $32,884k 10,961k
MMBtu
$3.28

18

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $411k 34k
MMBtu
0.3%
- Electrical $217k 3,284k
kWh
5.4%
- Natural Gas $22k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $412k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $38,517k 12,415k
MMBtu
$4.25
- Electrical $3,908k 60,271k
kWh
$0.065
- Natural Gas $32,884k 10,961k
MMBtu
$3.28

5

Implemented Recommendations

1.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 9.2k
MMBtu
0.1%
- Electrical $61k 900k
kWh
1.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall