ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Packing and crating
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $359k 30k
MMBtu
$12.50
- Electrical $137k 1,576k
kWh
$0.082
- Natural Gas $60k 8.0k
MMBtu
$4.80

27

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.6k
MMBtu
12.0%
- Electrical $25k 350k
kWh
22.2%
- Natural Gas $12k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $359k 30k
MMBtu
$12.50
- Electrical $137k 1,576k
kWh
$0.082
- Natural Gas $60k 8.0k
MMBtu
$4.80

7

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3.7k 0.4k
MMBtu
1.5%
- Electrical $3.6k 43k
kWh
2.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $3.7k
*May be negative reflecting an increased cost component required to save energy and costs overall