ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Transportation services
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,982k 259k
MMBtu
$14.44
- Electrical $1,038k 22,713k
kWh
$0.084
- Natural Gas $135k 25k
MMBtu
$4.76

78

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $127k 22k
MMBtu
8.5%
- Electrical $117k 2,157k
kWh
9.5%
- Natural Gas ($-1.9)k -
MMBtu
-
Waste -
Productivity/Other ($-7.6)k
TOTAL $120k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,137k 280k
MMBtu
$15.04
- Electrical $1,109k 24,540k
kWh
$0.085
- Natural Gas $143k 27k
MMBtu
$4.15

29

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 8.5k
MMBtu
3.0%
- Electrical $39k 832k
kWh
3.4%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall