ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Transportation services
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,164k 285k
MMBtu
$8.96
- Electrical $1,136k 24,963k
kWh
$0.065
- Natural Gas $148k 27k
MMBtu
$5.23

74

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $133k 24k
MMBtu
8.5%
- Electrical $126k 2,360k
kWh
9.5%
- Natural Gas ($-2.1)k -
MMBtu
-
Waste -
Productivity/Other ($-8.4)k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,357k 311k
MMBtu
$9.01
- Electrical $1,225k 27,243k
kWh
$0.064
- Natural Gas $159k 29k
MMBtu
$4.62

29

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 9.5k
MMBtu
3.0%
- Electrical $43k 924k
kWh
3.4%
- Natural Gas $0.3k -
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall