The ITAC Statistics page displays the average assessment results for the selected criteria.
10
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $2,164k | 285k |
MMBtu
|
$8.96 |
- Electrical | $1,136k | 24,963k |
kWh
|
$0.065 |
- Natural Gas | $148k | 27k |
MMBtu
|
$5.23 |
74
Recommendations
7.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $133k | 24k |
MMBtu
|
8.5% |
- Electrical | $126k | 2,360k |
kWh
|
9.5% |
- Natural Gas | ($-2.1)k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($-8.4)k | |||
TOTAL | $125k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
9
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $2,357k | 311k |
MMBtu
|
$9.01 |
- Electrical | $1,225k | 27,243k |
kWh
|
$0.064 |
- Natural Gas | $159k | 29k |
MMBtu
|
$4.62 |
29
Implemented Recommendations
3.2
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $45k | 9.5k |
MMBtu
|
3.0% |
- Electrical | $43k | 924k |
kWh
|
3.4% |
- Natural Gas | $0.3k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.0k | |||
TOTAL | $45k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |