ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Airports, flying fields, and airport terminal services
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $185k 14k
MMBtu
$14.41
- Electrical $63k 871k
kWh
$0.090
- Natural Gas $38k 4.1k
MMBtu
$9.23

55

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.2k
MMBtu
15.2%
- Electrical $15k 210k
kWh
24.1%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other $17k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $201k 15k
MMBtu
$14.44
- Electrical $65k 932k
kWh
$0.086
- Natural Gas $43k 4.6k
MMBtu
$10.39

15

Implemented Recommendations

1.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.3k 0.9k
MMBtu
5.9%
- Electrical $6.1k 89k
kWh
9.5%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $7.6k
*May be negative reflecting an increased cost component required to save energy and costs overall