ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Transportation by air
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $208k 15k
MMBtu
$15.30
- Electrical $67k 868k
kWh
$0.093
- Natural Gas $43k 4.7k
MMBtu
$10.51

47

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.0k
MMBtu
13.5%
- Electrical $14k 199k
kWh
22.9%
- Natural Gas $1.4k -
MMBtu
-
Waste -
Productivity/Other $1.9k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $248k 18k
MMBtu
$16.59
- Electrical $63k 942k
kWh
$0.082
- Natural Gas $53k 5.8k
MMBtu
$10.26

12

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.4k
MMBtu
8.2%
- Electrical $9.6k 141k
kWh
14.9%
- Natural Gas $0.0k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $11k
*May be negative reflecting an increased cost component required to save energy and costs overall