The ITAC Statistics page displays the average assessment results for the selected criteria.
2
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $110k | 8.8k |
MMBtu
|
$13.37 |
- Electrical | $70k | 733k |
kWh
|
$0.10 |
- Natural Gas | $11k | 1.3k |
MMBtu
|
$4.16 |
10
Recommendations
5.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $8.8k | 0.7k |
MMBtu
|
8.1% |
- Electrical | $6.4k | 69k |
kWh
|
9.5% |
- Natural Gas | $2.3k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $43k | |||
TOTAL | $51k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
2
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $110k | 8.8k |
MMBtu
|
$13.37 |
- Electrical | $70k | 733k |
kWh
|
$0.10 |
- Natural Gas | $11k | 1.3k |
MMBtu
|
$4.16 |
4
Implemented Recommendations
2.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $0.7k | 0.1k |
MMBtu
|
0.7% |
- Electrical | $0.7k | 5.7k |
kWh
|
0.8% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $43k | |||
TOTAL | $43k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |