ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Refrigerated warehousing and storage
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $734k 60k
MMBtu
$12.22
- Electrical $513k 5,598k
kWh
$0.089
- Natural Gas $18k 2.7k
MMBtu
$2.56

104

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 11k
MMBtu
18.7%
- Electrical $109k 1,100k
kWh
19.7%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.1k
Productivity/Other $24k
TOTAL $159k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $548k 56k
MMBtu
$11.47
- Electrical $376k 5,056k
kWh
$0.084
- Natural Gas $22k 3.3k
MMBtu
$2.84

49

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.3k
MMBtu
4.2%
- Electrical $18k 226k
kWh
4.5%
- Natural Gas $2.2k -
MMBtu
-
Waste -
Productivity/Other $0.4k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall