ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Public warehousing and storage
3+ Characters Required for Products

24

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $631k 73k
MMBtu
$9.93
- Electrical $312k 4,502k
kWh
$0.079
- Natural Gas $162k 27k
MMBtu
$3.12

162

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 5.9k
MMBtu
8.1%
- Electrical $44k 576k
kWh
12.8%
- Natural Gas $26k -
MMBtu
-
Waste $0.2k
Productivity/Other $28k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $495k 67k
MMBtu
$9.31
- Electrical $187k 3,287k
kWh
$0.071
- Natural Gas $223k 34k
MMBtu
$3.41

65

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.9k
MMBtu
5.7%
- Electrical $23k 378k
kWh
11.5%
- Natural Gas $1.7k -
MMBtu
-
Waste -
Productivity/Other $18k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall