ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Public warehousing and storage
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $656k 69k
MMBtu
$11.51
- Electrical $368k 4,574k
kWh
$0.092
- Natural Gas $131k 21k
MMBtu
$3.55

199

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $112k 8.1k
MMBtu
11.8%
- Electrical $72k 792k
kWh
17.3%
- Natural Gas $22k -
MMBtu
-
Waste $0.2k
Productivity/Other $25k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $479k 66k
MMBtu
$9.33
- Electrical $182k 3,193k
kWh
$0.071
- Natural Gas $202k 33k
MMBtu
$3.09

66

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.6k
MMBtu
5.5%
- Electrical $22k 354k
kWh
11.1%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall