The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 422 Public warehousing and storage

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $681k 71k
MMBtu
$10.41
- Electrical $373k 4,677k
kWh
$0.086
- Natural Gas $142k 23k
MMBtu
$3.66

180

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 7.6k
MMBtu
10.7%
- Electrical $67k 746k
kWh
15.9%
- Natural Gas $23k -
MMBtu
-
Waste $0.2k
Productivity/Other $27k
TOTAL $136k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $498k 69k
MMBtu
$9.08
- Electrical $186k 3,313k
kWh
$0.070
- Natural Gas $213k 35k
MMBtu
$3.26

66

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.8k
MMBtu
5.5%
- Electrical $23k 373k
kWh
11.3%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other $17k
TOTAL $48k