ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Public warehousing and storage
3+ Characters Required for Products

36

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $592k 61k
MMBtu
$12.04
- Electrical $331k 4,067k
kWh
$0.096
- Natural Gas $121k 19k
MMBtu
$4.44

221

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 7.7k
MMBtu
12.6%
- Electrical $69k 749k
kWh
18.4%
- Natural Gas $19k -
MMBtu
-
Waste $0.2k
Productivity/Other $22k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $528k 63k
MMBtu
$11.64
- Electrical $268k 3,946k
kWh
$0.092
- Natural Gas $140k 23k
MMBtu
$4.15

94

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.9k
MMBtu
4.5%
- Electrical $21k 281k
kWh
7.1%
- Natural Gas $2.8k -
MMBtu
-
Waste -
Productivity/Other $11k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall