ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor freight transportation and warehousing
3+ Characters Required for Products

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $677k 69k
MMBtu
$10.94
- Electrical $293k 4,120k
kWh
$0.084
- Natural Gas $142k 23k
MMBtu
$3.66

178

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $111k 6.3k
MMBtu
9.2%
- Electrical $50k 615k
kWh
14.9%
- Natural Gas $23k -
MMBtu
-
Waste $0.2k
Productivity/Other $24k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $498k 69k
MMBtu
$9.08
- Electrical $186k 3,313k
kWh
$0.070
- Natural Gas $213k 35k
MMBtu
$3.26

66

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.8k
MMBtu
5.5%
- Electrical $23k 373k
kWh
11.3%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other $17k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall