ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor freight transportation and warehousing
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $658k 62k
MMBtu
$12.62
- Electrical $324k 3,980k
kWh
$0.096
- Natural Gas $117k 19k
MMBtu
$4.32

225

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $121k 7.2k
MMBtu
11.6%
- Electrical $65k 703k
kWh
17.7%
- Natural Gas $19k -
MMBtu
-
Waste $0.2k
Productivity/Other $21k
TOTAL $143k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $612k 64k
MMBtu
$12.37
- Electrical $262k 3,842k
kWh
$0.092
- Natural Gas $135k 22k
MMBtu
$4.01

94

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.8k
MMBtu
4.3%
- Electrical $20k 271k
kWh
7.1%
- Natural Gas $2.7k -
MMBtu
-
Waste -
Productivity/Other $10k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall