ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Local and suburban passenger transportation
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,177k 328k
MMBtu
$21.90
- Electrical $110k 1,765k
kWh
$0.063
- Natural Gas $53k 5.5k
MMBtu
$9.71

8

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $528k 2.5k
MMBtu
0.8%
- Electrical $14k 243k
kWh
13.8%
- Natural Gas $6.5k -
MMBtu
-
Waste -
Productivity/Other $0.6k
TOTAL $529k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,177k 328k
MMBtu
$21.90
- Electrical $110k 1,765k
kWh
$0.063
- Natural Gas $53k 5.5k
MMBtu
$9.71

6

Implemented Recommendations

6.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 2.3k
MMBtu
0.7%
- Electrical $13k 228k
kWh
12.9%
- Natural Gas $6.5k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall