ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Burial caskets
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $663k 115k
MMBtu
$7.58
- Electrical $299k 6,600k
kWh
$0.061
- Natural Gas $219k 30k
MMBtu
$13.46

81

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 5.9k
MMBtu
5.1%
- Electrical $36k 571k
kWh
8.7%
- Natural Gas $35k -
MMBtu
-
Waste $0.7k
Productivity/Other $12k
TOTAL $94k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $663k 115k
MMBtu
$7.58
- Electrical $299k 6,600k
kWh
$0.061
- Natural Gas $219k 30k
MMBtu
$13.46

52

Implemented Recommendations

4.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 3.0k
MMBtu
2.7%
- Electrical $20k 297k
kWh
4.5%
- Natural Gas $27k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.4k
TOTAL $53k