ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Signs and advertising specialties
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $199k 29k
MMBtu
$7.83
- Electrical $116k 2,118k
kWh
$0.066
- Natural Gas $40k 6.9k
MMBtu
$5.84

356

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.9k
MMBtu
13.4%
- Electrical $24k 376k
kWh
17.7%
- Natural Gas $6.0k -
MMBtu
-
Waste $2.2k
Productivity/Other $12k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall

46

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $199k 29k
MMBtu
$7.76
- Electrical $115k 2,133k
kWh
$0.065
- Natural Gas $39k 7.0k
MMBtu
$5.72

153

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 0.9k
MMBtu
3.1%
- Electrical $7.5k 88k
kWh
4.1%
- Natural Gas $3.2k -
MMBtu
-
Waste $0.2k
Productivity/Other $3.0k
TOTAL $16k