ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Brooms and brushes
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $148k 21k
MMBtu
$8.79
- Electrical $114k 1,728k
kWh
$0.081
- Natural Gas $17k 2.6k
MMBtu
$5.34

147

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.1k
MMBtu
10.3%
- Electrical $16k 209k
kWh
12.1%
- Natural Gas $4.8k -
MMBtu
-
Waste $0.8k
Productivity/Other $11k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall

22

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $148k 21k
MMBtu
$8.79
- Electrical $114k 1,728k
kWh
$0.081
- Natural Gas $17k 2.6k
MMBtu
$5.34

76

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.3k
MMBtu
6.5%
- Electrical $10k 130k
kWh
7.5%
- Natural Gas $0.9k -
MMBtu
-
Waste $0.4k
Productivity/Other $0.5k
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall