ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous manufacturing industries
3+ Characters Required for Products

193

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $714k 117k
MMBtu
$8.52
- Electrical $381k 7,217k
kWh
$0.071
- Natural Gas $214k 42k
MMBtu
$6.18

1,445

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 9.9k
MMBtu
8.5%
- Electrical $44k 969k
kWh
13.4%
- Natural Gas $21k -
MMBtu
-
Waste $1.7k
Productivity/Other $28k
TOTAL $110k
*May be negative reflecting an increased cost component required to save energy and costs overall

186

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $728k 120k
MMBtu
$8.46
- Electrical $389k 7,401k
kWh
$0.071
- Natural Gas $219k 43k
MMBtu
$6.15

629

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.4k
MMBtu
2.0%
- Electrical $14k 230k
kWh
3.1%
- Natural Gas $10k -
MMBtu
-
Waste $0.6k
Productivity/Other $6.3k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall