ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Costume jewelry, costume novelties, buttons, and miscellaneous notions, ecept precious metal
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $852k 93k
MMBtu
$7.95
- Electrical $308k 4,173k
kWh
$0.070
- Natural Gas $338k 51k
MMBtu
$5.89

91

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $382k 22k
MMBtu
23.1%
- Electrical $247k 2,107k
kWh
50.5%
- Natural Gas ($-28.5)k -
MMBtu
-
Waste $7.5k
Productivity/Other ($-7.3)k
TOTAL $383k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $625k 73k
MMBtu
$7.69
- Electrical $201k 2,992k
kWh
$0.068
- Natural Gas $264k 42k
MMBtu
$5.68

26

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 0.8k
MMBtu
1.1%
- Electrical $5.0k 77k
kWh
2.6%
- Natural Gas $8.2k -
MMBtu
-
Waste $5.3k
Productivity/Other $3.4k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall