ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Carbon paper and inked ribbons
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $303k 41k
MMBtu
$7.22
- Electrical $197k 2,953k
kWh
$0.073
- Natural Gas $57k 11k
MMBtu
$5.95

80

Recommendations

8.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 3.7k
MMBtu
9.0%
- Electrical $25k 361k
kWh
12.2%
- Natural Gas $7.8k -
MMBtu
-
Waste $0.9k
Productivity/Other ($0.0)k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $251k 39k
MMBtu
$6.66
- Electrical $171k 2,594k
kWh
$0.073
- Natural Gas $61k 12k
MMBtu
$5.21

43

Implemented Recommendations

5.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.0k
MMBtu
5.2%
- Electrical $14k 197k
kWh
7.6%
- Natural Gas $5.9k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $22k