ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pens, pencils, and other artists materials
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $288k 44k
MMBtu
$7.58
- Electrical $202k 3,424k
kWh
$0.072
- Natural Gas $40k 7.5k
MMBtu
$5.69

232

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 5.1k
MMBtu
11.6%
- Electrical $36k 497k
kWh
14.5%
- Natural Gas $10k -
MMBtu
-
Waste $1.9k
Productivity/Other $54k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $274k 43k
MMBtu
$7.44
- Electrical $195k 3,344k
kWh
$0.072
- Natural Gas $41k 7.7k
MMBtu
$5.48

116

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.7k
MMBtu
6.1%
- Electrical $17k 260k
kWh
7.8%
- Natural Gas $3.8k -
MMBtu
-
Waste $0.4k
Productivity/Other $2.3k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall