ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Silverware, plated ware, and stainless steel ware
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $247k 47k
MMBtu
$5.89
- Electrical $184k 3,656k
kWh
$0.057
- Natural Gas $35k 6.8k
MMBtu
$5.90

30

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.9k
MMBtu
6.2%
- Electrical $25k 281k
kWh
7.7%
- Natural Gas $4.0k -
MMBtu
-
Waste $14k
Productivity/Other $6.8k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $247k 47k
MMBtu
$5.89
- Electrical $184k 3,656k
kWh
$0.057
- Natural Gas $35k 6.8k
MMBtu
$5.90

21

Implemented Recommendations

5.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.7k
MMBtu
5.9%
- Electrical $24k 268k
kWh
7.3%
- Natural Gas $4.0k -
MMBtu
-
Waste $14k
Productivity/Other $6.5k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall