ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Jewelry, precious metal
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $254k 60k
MMBtu
$6.77
- Electrical $113k 3,255k
kWh
$0.044
- Natural Gas $38k 26k
MMBtu
$5.12

27

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 8.0k
MMBtu
13.3%
- Electrical $30k 778k
kWh
23.9%
- Natural Gas $8.3k -
MMBtu
-
Waste -
Productivity/Other $0.9k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $254k 60k
MMBtu
$6.77
- Electrical $113k 3,255k
kWh
$0.044
- Natural Gas $38k 26k
MMBtu
$5.12

9

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.4k 1.3k
MMBtu
2.2%
- Electrical $5.6k 128k
kWh
3.9%
- Natural Gas $1.0k -
MMBtu
-
Waste -
Productivity/Other $0.8k
TOTAL $8.2k
*May be negative reflecting an increased cost component required to save energy and costs overall