ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous manufacturing industries
3+ Characters Required for Products

341

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $590k 95k
MMBtu
$7.83
- Electrical $317k 5,949k
kWh
$0.066
- Natural Gas $168k 32k
MMBtu
$5.83

2,529

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 8.1k
MMBtu
8.6%
- Electrical $43k 792k
kWh
13.3%
- Natural Gas $15k -
MMBtu
-
Waste $3.1k
Productivity/Other $28k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

337

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $585k 95k
MMBtu
$7.80
- Electrical $315k 5,950k
kWh
$0.066
- Natural Gas $166k 32k
MMBtu
$5.83

1,162

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.3k
MMBtu
2.4%
- Electrical $13k 220k
kWh
3.7%
- Natural Gas $7.8k -
MMBtu
-
Waste $1.2k
Productivity/Other $5.6k
TOTAL $32k