ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electromedical and electrotherapeutic apparatus
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $595k 56k
MMBtu
$8.61
- Electrical $454k 4,968k
kWh
$0.076
- Natural Gas $30k 5.0k
MMBtu
$4.13

120

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 6.9k
MMBtu
12.4%
- Electrical $63k 676k
kWh
13.6%
- Natural Gas $3.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $28k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $606k 57k
MMBtu
$8.47
- Electrical $468k 5,093k
kWh
$0.077
- Natural Gas $30k 4.9k
MMBtu
$4.01

54

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 5.2k
MMBtu
9.1%
- Electrical $47k 506k
kWh
9.9%
- Natural Gas $1.1k -
MMBtu
-
Waste -
Productivity/Other $6.2k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall