The ITAC Statistics page displays the average assessment results for the selected criteria.
261
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $609k | 174k |
MMBtu
|
$9.19 |
- Electrical | $409k | 6,303k |
kWh
|
$0.075 |
- Natural Gas | $61k | 109k |
MMBtu
|
$4.88 |
1,904
Recommendations
7.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $113k | 14k |
MMBtu
|
7.8% |
- Electrical | $90k | 1,318k |
kWh
|
20.9% |
- Natural Gas | ($-3.5)k | - |
MMBtu
|
- |
Waste | $3.1k | |||
Productivity/Other | $22k | |||
TOTAL | $139k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
250
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $599k | 175k |
MMBtu
|
$8.95 |
- Electrical | $408k | 6,188k |
kWh
|
$0.074 |
- Natural Gas | $56k | 111k |
MMBtu
|
$4.82 |
899
Implemented Recommendations
3.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $42k | 4.8k |
MMBtu
|
2.8% |
- Electrical | $33k | 473k |
kWh
|
7.6% |
- Natural Gas | $1.0k | - |
MMBtu
|
- |
Waste | $0.6k | |||
Productivity/Other | $6.6k | |||
TOTAL | $49k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |