The ITAC Statistics page displays the average assessment results for the selected criteria.
259
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $613k | 175k |
MMBtu
|
$9.12 |
- Electrical | $412k | 6,345k |
kWh
|
$0.074 |
- Natural Gas | $61k | 109k |
MMBtu
|
$4.84 |
1,895
Recommendations
7.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $114k | 14k |
MMBtu
|
7.8% |
- Electrical | $91k | 1,328k |
kWh
|
20.9% |
- Natural Gas | ($-3.5)k | - |
MMBtu
|
- |
Waste | $3.2k | |||
Productivity/Other | $22k | |||
TOTAL | $140k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
249
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $599k | 176k |
MMBtu
|
$8.89 |
- Electrical | $408k | 6,206k |
kWh
|
$0.073 |
- Natural Gas | $56k | 112k |
MMBtu
|
$4.79 |
899
Implemented Recommendations
3.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $42k | 4.9k |
MMBtu
|
2.8% |
- Electrical | $33k | 475k |
kWh
|
7.6% |
- Natural Gas | $1.0k | - |
MMBtu
|
- |
Waste | $0.6k | |||
Productivity/Other | $6.6k | |||
TOTAL | $50k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |