ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory analytical instruments
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $501k 59k
MMBtu
$9.91
- Electrical $333k 4,632k
kWh
$0.076
- Natural Gas $63k 11k
MMBtu
$6.09

242

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 7.0k
MMBtu
12.0%
- Electrical $53k 684k
kWh
14.8%
- Natural Gas $6.8k -
MMBtu
-
Waste $3.3k
Productivity/Other $95k
TOTAL $175k
*May be negative reflecting an increased cost component required to save energy and costs overall

31

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $511k 60k
MMBtu
$9.74
- Electrical $341k 4,757k
kWh
$0.076
- Natural Gas $66k 11k
MMBtu
$5.68

107

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.4k
MMBtu
4.0%
- Electrical $21k 239k
kWh
5.0%
- Natural Gas $3.4k -
MMBtu
-
Waste $2.1k
Productivity/Other $82k
TOTAL $115k