ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Totalizing fluid meters and counting devices
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $402k 153k
MMBtu
$6.77
- Electrical $292k 5,280k
kWh
$0.060
- Natural Gas $56k 98k
MMBtu
$5.50

141

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.9k
MMBtu
2.5%
- Electrical $22k 378k
kWh
7.2%
- Natural Gas $8.6k -
MMBtu
-
Waste $0.9k
Productivity/Other $7.3k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $402k 153k
MMBtu
$6.77
- Electrical $292k 5,280k
kWh
$0.060
- Natural Gas $56k 98k
MMBtu
$5.50

64

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.9k
MMBtu
1.2%
- Electrical $11k 181k
kWh
3.4%
- Natural Gas $2.5k -
MMBtu
-
Waste $0.0k
Productivity/Other $3.8k
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall